Apr 26, 2012

China talks with Turkey about $20 billion nuclear project @nextbigfuture

The Turkish government recently signed a $20 billion project with Russia to build nuclear power facilities in Akkuyu, Turkey. Now the Turkish government has set its sights on constructing a nuclear plant in Sinop, Turkey. The Financial Times recently reported that China is the primary contender for this contract due to its ability to secure financing without requiring guarantees from the Turkish government. Turkish Prime Minister Recep Tayyip Erdogan visited China last week, confirming reports of the deal when Energy Minister Tanir Yildiz held talks with Chinese authorities. At these meetings, Chinese Energy authority Liu Tienan pledged full financial guarantees for the $20 billion project.

Not just financial guarantees - but half the price

Starting from French reactors imported in the 1980s, Chinese engineers have developed their own large reactor systems to the point that exports appear possible from 2013.

Having imported two 900 MWe pressurized water reactors for the Daya Bay nuclear power plant, CGNPC engineers embarked on a development program that led to the CPR-1000 design. The first of these began operation at Ling Ao Phase II in September, while 16 are under construction and many more planned. A domestic supply chain has been built up with each project and now only about ten percent of components need to be imported.

By 2013, Zhang said, a further design evolution will clear certain areas of intellectual property retained by Areva, resulting in a Generation III design called the ACPR-1000 that CGNPC could market in other countries.

The current CPR-1000 design sits roughly between today's mainstream Generation II reactors and the latest Generation III units, with digital instrumentation and control systems and a design life of 60 years. Standard construction time is 52 months, and the unit cost for Chinese units so far has been under CNY 10,000 ($1500) per kilowatt. This is less than half the price of US and European nuclear reactors.


  Nuclear construction projects in China have moved forward with the dome of unit 1 of the Fangchenggang plant being lowered into place and heavy components for the primary reactor coolant system of the first EPR at Taishan have being delivered from France.

Read more at NBF »