May 24, 2012

Rossi Energy Cold Fusion Catalyzer, Defkalion and other LENR Updates

Ecat World reports that the most recent issue of the American Chemical Society’s Chemical and Engineering News magazine includes an article entitled, “Reviving Cold Fusion.” written by Steven K. Ritter. The brief summary reads, “After 20-plus years of outcast status, unconventional heat-producing nuclear reactions still seem plausible”.

The article is really a review of the history and current state of LENR, much of its content is what people following recent developments in LENR research already know. Ritter contacted a number of people involved in the field, including Dennis Bushnell of NASA, Robert Duncan of the University of Missouri, Steven B. Krivit of New Energy Times, and Andrea Rossi. Quite a bit of the article is devoted to describing Rossi’s E-Cat, and emphasizes that as yet it is unproven.

Bushnell maintains that, “From more than two decades of experiments producing heat and transmutations, ‘something’ is real and happening.”

Krivit says of the E-Cat, ““Rossi has no credible evidence for his extraordinary claims, I have stopped paying attention to him.”

Duncan states, ” “I don’t need to have an opinion about the E-Cat. Nobody does. Rossi is claiming to be going commercial with it. If he does deliver to the marketplace, then the marketplace will decide the efficacy of the technology.


PESN has an update on the LENR to Market for May 17.

Ecat.com has the main Rossi ecat update

ECAT Licensees to be revealed October, 2012

Leonardo Corp have a number of Licensees for its products for various regions around the world including its northern Europe Licensee Hydro Fusion Ltd, which also attended the E-Cat 1MW October test. All E-Cat Licensees have attended demos of operating E-Cat units.

A convention will be held for all E-Cat Licensees and is set for October. An official list of all licensees will then be published online at ECAT.com.


ECAT 1 MW Updates


One ECAT 1 MW plant has been delivered and is working in a military facility. Andrea Rossi recently made the following statement:

“The 1 MW plant has been delivered and is working in a military concern. It has been made in the USA, after the October test of the prototype made in Italy; such prototype will be delivered, with the modifications which we will complete based on what we learnt from the model at work, to a European Customer in July. ”

The ECAT 1 MW plant in USA is now stable at very high temperatures.
The industrial plants will get the necessary certification within weeks.
The price for an E-Cat 1 MW plant is still $1.5M; orders can be made from the inquiry form on the right side at this website.


Home ECAT-units will not be available until 2012-2013 due to rigid testing, certification and regulation procedures.

Rossi has stated that the ecat (Energy Catalyzer) works at 600 degrees celsius which is a high enough temperature to power generation of electricity

Read more »